Projects
Trusted To Deliver Projects
Done One. Done Right.
You do not get asked back, or recommended to others, unless you do the job properly.
From national contractors and catering specialists to some of the UK’s best-known pub and restaurant brands, our clients trust the ADOS Group team because they know we take pride in every installation.
Sometimes we’re appointed direct, and other times we work alongside trusted industry partners. One thing remains the same, no matter the scenario, every project is approached with the same care, quality, expertise and attention to detail.
We’re chosen because we do a proper job. Here are just some of the businesses we’re proud to work with.
Projects
Here are a selection of projects that we have worked on.
Project 1 - Brewery
This project had to be delivered within a maximum of six-weeks. In week one it required a full rip out. We then fitted slip-resistant flooring on site, installed the new canopy ready for the full fit out.
As the experts in commercial catering equipment and kitchen installation, we then kitted out the space within 3-4 days, ready for client handover.
Refrigeration was a key requirement for this project, as you can probably imagine!
Project 2 - Deliveroo Bermondsey
A really cool project where we installed a dark kitchen in the heart of Bermondsey to be utilised by popular Indian food chain Dishoom. Deliveroo provides commercial kitchen facilities to restaurant brands, that they can rent, creating a local base for them to prepare, and supply food from.
In total it took 4 engineers, spread over 2 days to complete this project.
Project 3 - Eggslut
A design and build project for internationally recognised hospitality brand, who demanded an extremely high-quality finish, complex coordination of trades, precision and fast installation.
The finished product – an incredibly beautiful kitchen install kitchen with a high-shine.
Project 4 - Greene King Pubs
From an empty room to a fully functioning kitchen for a Greene King pub, spread over 4 days we completed this installation with 4 members of the team.
On handover we then carried out full training on all the new appliances. Whilst this is just one project, we are a trusted partner, and we’re relied upon time and time again by the brilliant Greene King chain.
Project 5 - Kings Arms Oxfordshire
A complete commercial kitchen rip out and reinstallation of all the equipment.
One of the biggest challenges on this project was access. Installing a key piece of commercial catering equipment weighing approximately 150kg required careful planning, specialist lifting and an experienced installation team to manoeuvre it safely into position without compromising the building or surrounding work areas.
Luckily for the Kings Arms we have all the infrastructure to be able to do this.
Project 6 - Meet The Fish
A premium commercial kitchen for a Michelin-standard dining experience.
For the Meet the Fish project in Chelsea, ADOS Group delivered the installation of premium Electrolux commercial catering equipment, suite units were expertly bolted together, and we even installed imported worktops.
We coordinated every stage of the process from logistics through to final installation with ease, with the kitchen located underground this could have been quite the challenge for someone unprepared.
Project 7 - Wagamama Heathrow
A complex commercial kitchen refurbishment within one of the UK’s busiest airports. The airport remained live and was located in the departures lounge.
We delivered a brand-new bar installation alongside modifications to approximately 90% of the existing commercial kitchen.
Projects like this demand organisation, communication and a commitment to doing things properly from the start.
Key Customers





Subcontracting For





From start to finish, ADOS Group designs, builds and installs commercial kitchens that are built to last.
If your goal is to install approved commercial catering equipment and kitchens,
get in touch with our specialist team to discuss your project.